Laserfiche WebLink
The only impoundments existing within the permit area in addition to sediment ponds are <br />sewage lagoons, and three non-discharging sumps. Former Mine-water treatment pond 12 has <br />been reclaimed. A set of evaporative, non-discharging sewage lagoons has been permitted near <br />the loadout for treating water from the Roadside Mine and the loadout. <br />Two small sumps were constructed in the North Decline reclamation area and one sump was <br />constructed in the Cameo Borrow Area #1 (CBA-1) to serve to capture and treat runoff from <br />reclaimed lands. These sumps are adequately sized to contain runoff from a 25-year, 24-hour <br />storm event. <br />F. Surface and Groundwater Monitoring <br />The permittee will conduct monitoring of groundwater in a manner approved by the <br />Division. The groundwater monitoring plan is detailed in Tab 18 of the permit application. <br />Piezometers have been installed in various permit area locations to monitor water level <br />and/or quality in alluvium, refuse fill, the Rollins Sandstone and abandoned sections ofthe <br />South Portals Mine. Monitoring locations are shown on "Roadside and Cameo No.1 <br />Mines Hydrologic Monitoring Map" (Exhibit 56), in Tab 18. The groundwater <br />monitoring plan is outlined below; for additional detail refer to Tab 18 of the approved <br />permit. (4.05.13(1)) <br />Rapid Creek and Cottonwood Creek Piezometers <br />GWMS-OIA, 01B, 02A, 0213, 03A, and 0313, monitor water levels May and September. <br />CRDA Piezometers <br />CRDA-0 1 through 03, and 01 A; and thirty piezometers (Pz 100-107, 200-206, 300-307, <br />and 400-406), all on CRDA-l, monitored quarterly for water level. "Critical levels" <br />defined for 100, 200, 300, and 400 series piezometers. <br />CRDA-04 through 06 installed on CRDA-2, monitored quarterly for water level. <br />Unit Train Loadout Piezometers <br />Quarterly water level monitoring UTL-01,02,03,04; <br />Annual water quality monitoring UTL-02 and UTL-04 (parameters listed in Permit Table <br />18-3) <br />Roadside South Portal Workings <br />Well N-1, located at reclaimed North Decline; quarterly water level monitoring. <br />Rollins Sandstone Wells <br />Rollins-2 (At UTL) <br />Rollins-3 (Near Pond 7, North Decline) <br />Permit Renewal No. 5 26 November 16, 2007