Laserfiche WebLink
New Horizon Mine, ]2g 4 <br /> Quarterly sediment pond inspections; an annual, certified impoundment recertification <br /> demonstrating sediment storage capacity; the annual hydrologic report, and the annual <br /> reclamation report are in order. Quarterly NPDES /DMR's are current, and DMR non- <br /> compliances (primarily WET testing from 2 of the sedimentation ponds)were reported to me as <br /> requested since my last inspection here in 2005. The storm water management plan is dated <br /> 2008; SPCC plan is dated 2004 and certified as required (we discussed recertification during <br /> January 2009) The most recent blasting publication is dated March 27, 2008. <br /> Total current bond liability is $3,150,563.00. We discussed if DRMS can provide Mr. Gubka the <br /> CIRCES bond calculation software. I indicated I will look into providing reference to the OSM <br /> Diversion Design Manual for Mr. Gubka's use. There have been no formal citizen complaints <br /> filed with the DRMS since my last inspection here. This concluded the inspection. <br /> Address any questions concerning this report to Henry Austin, Senior Reclamation Specialist, at <br /> haustingosmre. og_v or to (303) 293-5019. <br />