Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permittee/ TRAPPER MINING,INC. Permit C-010-81 Field Visit 11/12/2008 Continuation Page <br /> Person Number Date <br /> 28. Performance Standard Categories <br /> Codes: 1=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,5=Noncompliance Identified Elsewhere,6=Previously Cited . <br /> A. Administrative D. Backfilling&Grading H. Subsidence Control Plan <br /> 1._Mining within Valid Permit 1. , Exposed Openings - <br /> 2._Mining within Bonded Area 2. _Contem oraneous Reclamation I. Roads <br /> 3._Terms&Conditions of Permit p 1._Road Construction <br /> 3.-Approximate Original Contour 2. Certification <br /> 4._Liability Insurance 4. Highwall Elimination 3. Drainage <br /> 5._Ownership and Control 5._SteepSlopes includes downslo e - <br /> 6. Temporary Cessation p ( p ) 4.-Surfacing and Maintenance <br /> P rY 6. Handling of Acid&Toxic Materials 5._Reclamation <br /> 7._AML Rec.Fees--Non-Respondent 7. 1 Stabilization(rills and gullies) J. Signs&Markers <br /> 8._AML Rec.Fees--Failure to Pay E. Excess Spoil Disposal l._Signs <br /> B. Hydrologic Balance 1._Placement 2._Markers <br /> 1. 1 Drainage Control 2.- <br /> Drainage Control K. Distance Prohibitions <br /> 2. Inspections&Certifications 3. Surface Stabilization <br /> 3._Siltation Structures 4._Inspections&Certifications L. Revegetation <br /> 4. Discharge Structures F. Coal Mine Waste 1.-Vegetative Cover <br /> 2.-Timing5. 1 Diversions (Refuse Piles/Impoundments) <br /> M <br /> 6. Effluent Limits 1._Drainage Control M. _Postmining Land Use <br /> 7. Ground Water Monitoring 2.- <br /> Surface Stabilization N. Other <br /> 8. Surface Water Monitoring 3._Placement General <br /> 9. Drainage--Acid-Toxic Materials 4.- <br /> Inspections and Certifications Performance <br /> 10. Impoundments 5._Impounding Structures Catagory <br /> 11._Stream Buffer Zones G. Use Of Explosives -1) <br /> C. Topsoil&Subsoil 1.- <br /> Blaster Certification - <br /> 1. Removal 2.-Distance Prohibitions -2) <br /> 2. Substitute Materials 3._Blast Survey/Schedule - <br /> 3._Storage and Protection 4.-Warnings&Records -3) <br /> 4. Redistribution 5. Control of Adverse Effects - <br /> Performance Standard Catagories E. Excess Spoil Disposal...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement...........................................................................................71(e) <br /> - 2. Drainage Control 71(f) <br /> A. Administrative......................................................................... ................................................................................ <br /> 1. Valid Permit.....................................................................................773.11 3. Surface Stabilization...........................................................................71(g) <br /> 2. Mining within Bonded Area................................................773.11 4. Inspections&Certifications...............................................................71(h) <br /> 3. Terms&Conditions of Permit.............................................773.17 F. Coal Mine Waste(Refuse Piles/Impoundments) .....(816/817.81-84) <br /> 4. Liability Insurance................................................................800.60 <br /> 5. Ownership and Control........................................................ <br /> ......................................... .........778.13 1. Drainage Control...............................................................................83(a) <br /> 2. Surface Stabilization............... <br /> 6. Temporary Cessation..............................842.11(e)&816/817.131 ...........................................................83( ) <br /> 7. AML Rec.Fees--Non-Respondant................................870.15(b) 3. Placement..................................................................,.......................83(c) <br /> 8. AML Rec.Fees- Failure to Pay.....................................870.15(a) 4. Inspections and Certifications...........................................................83(d) <br /> 5. Impounding Structures...........................................................................84) <br /> B. Hydrologic Balance......................................(816/817.41-57) G. Use of Explosives.................................................. 816/817.61-68 <br /> 1. Drainage Control.........................................................................45 <br /> 2. Inspections&Certifications.............................................49(a)(10) 1. Blaster Certification...........................................................................61(c) <br /> 3. Siltation Structures......................................................................46 2. Distance Prohibitions.........................................................................61(d) <br /> ...................................................................47 3. Blast Survey/Schedule.......................................................................62.64 <br /> 4. Discharge Structures <br /> S. Diversions........... ...................................................................4 4. Warnings&Records......................................................................66&68 <br /> 6. Effluent Limits........................................................................ ..42 5. Control of Adverse Effects.....................................................................67 <br /> 7. Ground Water Monitoring......................................................41(c) H. Subsidence Control Plan.........................................(817.121-122) <br /> 8. Surface Water Monitoring......................................................41(e) 1. Roads.................................................................(816/817.150-151) <br /> 9. Drainage--Acid-Toxic Materials...........................................41(f) <br /> 10. Impoundments............................................................................49 1. Road Construction........................................................................... <br /> 11. Stream Buffer Zones...................................................................57 2. Certification...................................................................................... aa <br /> .. ( ) <br /> 3. Drainage...............................................................................150(b)-151(d) <br /> C. Topsoil&Subsoil...............................................(816/817.22) 4. Surfacing and Maintenance..................................................150(e)-151(d) <br /> 1. Removal..................................................................................22(a) 5. Reclamation......................................................................................150(f) <br /> 2. Substitute Materials.................................................................22(c) J. Signs&Markers.......................................................(816/817.11) <br /> 3. Storage and Protection.............................................................22(c) <br /> 4. Redistribution..........................................................................22(d) 1. Signs.....................................................................................II(a),(b),&(c) <br /> 2. Markers......................................................................1 I(a),(b),(d),(e),&(f) <br /> D. Backfilling&Grading..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br /> 1. Exposed Openings.....................816/817.13, 14, 15,&823.11 &21 L. Revegetation.....................................................(816/817.111-116) <br /> 2. Contemporaneous Reclamation..................................................100 <br /> 3. Approximate Original Contour..........................................102(a)(1) 1. Vegetative Cover.......................................................................III & 116 <br /> 4. Highwall Elimination.........................................................102(a)(2) 2. Timing..................................................................................................113 <br /> 5. Steep Slopes(includes downslope)............................................107 M. Postmining Land Use..............................................(816/817.133) <br /> 6. Handling of Acid&Toxic Materials......................................102(c) <br /> 7. Stabilization(rills and gullies)..................................................95(b) Revised December 4,1998 Page 2 of <br />