Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 14-Feb-2008 Permit or job no. M-1981-207 Site: Blue Pit <br />User: THM Abbreviation : none State :Colorado <br />Filename : M207-000 County :Garfield <br />Agency or organization name : DRMS <br />Permit or job action : Concrete Plant Demolition and 4' Overburden Placed Over Slabs for TR-06 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />0la -Concrete Plant Demolition demolish 1 40.0 $40,565 <br />02a -Place 6,000 CY of Overburden Over Conc. Plant Slab and Retaining Wall dozer 1 43.2 $6,934 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 83.2 $47,499 <br />includes inflation factor adjustment of : NA % TOTAL DIRECT COST' $47,499 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $959 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />$499 <br />NA <br />$4,750 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $6,2 08 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AM OUNT (direct + O & P) = $53,707 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = _ NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $2,685 <br />CONTINGENCY - NA* NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $9,393 <br />TOTAL BOND AMOUNT (direct + indirect) _ $56,892