My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_REVISION - M1977223 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2008-01-24_REVISION - M1977223 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:36:20 PM
Creation date
12/9/2008 1:31:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
1/24/2008
Doc Name
Bond Recalculation
From
DRMS
To
Five Rivers Ranch Cattle Feeding, LLC
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />volume : 21,333 CCY <br />factor : 1.165 volume:- 24,853 LCY <br />Source of estimated volume: Inspector GPS Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />»:.....::>:::.;;:.;:.::.;;;:.;:.;:.;;«:::>::>:<::<:>::>::> ;:.;::««:>.;:.;«<:;:.::::: ;:::::::.::::«<;::;;;::,, ................ <br />::::::: ................... :::::: ;::::::::::.................................. . <br />HOURLY PRODUCTION Job Condition Correction Factors <br />................ Source <br /> <br /> <br />Sou <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 685.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 3,750 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 lbs/LCY Net correction : 0.40 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Adjusted unit production : 271.78 LCY/hr <br />Adjusted fleet production : 543.55 LCY/hr <br />Total job time : 45.72 Hours <br />Unit cost : $0.629 /LCY Total job cost : $15,634
The URL can be used to link to this page
Your browser does not support the video tag.