Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />volume : 21,333 CCY <br />factor : 1.165 volume:- 24,853 LCY <br />Source of estimated volume: Inspector GPS Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />»:.....::>:::.;;:.;:.::.;;;:.;:.;:.;;«:::>::>:<::<:>::>::> ;:.;::««:>.;:.;«<:;:.::::: ;:::::::.::::«<;::;;;::,, ................ <br />::::::: ................... :::::: ;::::::::::.................................. . <br />HOURLY PRODUCTION Job Condition Correction Factors <br />................ Source <br /> <br /> <br />Sou <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 685.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 3,750 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 lbs/LCY Net correction : 0.40 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Adjusted unit production : 271.78 LCY/hr <br />Adjusted fleet production : 543.55 LCY/hr <br />Total job time : 45.72 Hours <br />Unit cost : $0.629 /LCY Total job cost : $15,634