Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :Calculate Reclamation Costs for New Operator <br />Task description : Reduce 2115 lin. ft of vertical pit walls to 3h:1 v slope <br />..................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.40 NA <br /> Operating cost/hour : $77.43 100 <br /> Ripper op. cost/hour : $3.35 50 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $170.96 Total fleet cost/hour : $341.92 <br /> <br />::::::::::::::::::::::::::: :::.:::::::: <br /> <br />MATERIAL QUANTITIES ....... <br />. <br />.................................................................. <br />............... <br />Initial Swell Loose <br />volume : 11,750 CCY factor : 1.165 volume : 13,689 LCY <br /> <br />Source of estimated volume: Inspector GPS Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />,.._........_........._ _ ......................_........... <br />HOURLY PRODUCTION .................._........_.................... .... , .................. <br />Job Condition Correction Factors ;:. :,:::. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 63 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,438.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency: 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile-: 0.80 (fnd-rf) <br /> Push gradient.. 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 3,750 feet Material weight : 0.79 (Cat HB) <br /> Blade type :. 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : _ 0.40 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production': 570.11 LCY/hr _ <br />- <br /> Adjusted fleet production : 1,140.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 12.01 Hours <br />Unit cost : $0.300 /LCY Total job cost : $4,105 <br />................................................................................................................... <br />................................................................................................................... <br />,I