My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-11_REVISION - M2005050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005050
>
2008-02-11_REVISION - M2005050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:15 PM
Creation date
12/9/2008 9:01:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
REVISION
Doc Date
2/11/2008
Doc Name
Reclamation liability update
From
DRMS
To
Bluerock Energy Corp.
Type & Sequence
SO1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 04a State :Colorado Permit/job# :M-2005-050 <br />Date <br />User <br />01/09/2008 <br />GRM <br />Agency or organization name : DRMS <br />Permit or other job action :Periodical and SO Update - 2008 <br />Task description : spread topsoil over 2 acres maxiumum disturbance <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D7R DS Series lI - 7SU Horsepower : 240____ <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $1.35 25 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $138.68 Total fleet cost/hour : $138.68 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,614 LCY factor : NA volume : 1,614 LCY <br />Source of estimated volume :reclamation plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 1.18 (Cat HB) <br />Average push gradient : 8.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,550 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.53 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 379.17 LCY/hr <br /> Adjusted fleet production : 379.17 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 4.26 Hours <br />Unit cost : $0.366 /LCY Total job cost : $590 <br />County :Montrose <br />Site :J-Birds Mine <br />Abbreviation : none <br />Filename :M050-04a
The URL can be used to link to this page
Your browser does not support the video tag.