My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-11_REVISION - M2005050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005050
>
2008-02-11_REVISION - M2005050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:15 PM
Creation date
12/9/2008 9:01:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
REVISION
Doc Date
2/11/2008
Doc Name
Reclamation liability update
From
DRMS
To
Bluerock Energy Corp.
Type & Sequence
SO1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a State : Colorado Permit/job # : M-2005-050 <br />Date : 0110912008 County :Montrose Abbreviation :none <br />User : GRM Site :J-Birds Mine Filename :M050-03a <br />Agency or organization name: DRMS <br />Permit or other job action :Periodical and SO Update -2008 <br />Task description :rip 2 acres of disturbance prior to topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series I/ - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $46.68 NA <br />Dozer operating cost/hour : $56.19 100 <br />Ripper operating cost/hour : $1.07 25 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $136.73 Total fleet cost/hour : $136.73 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.00 acres Rip depth (ft) : 2.00 Volume : 6,453 BCY or CCY <br /> <br />Source of estimated quantity : reclamation plans <br />Source of estimated l oad factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,083.79 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,550 feet <br />Average ripping width : 6.50 feet/pass Altitude adjustment : 1.00 (Cat HB)_ <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shift/day)_ <br />Average dozer speed : 88.00 feet/minute Netjob correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.646 acres/hour Adjusted unit production : 1,729.54 cu. yds./hour <br />Unadjusted production : 2,083.79 cu. yds./hour Adjusted fleet production : 1,729.54 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 3.73 hours <br />Unit cost : $0.079 per cu. yd. Total job cost : $510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.