My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-05_REVISION - M1978271
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978271
>
2008-02-05_REVISION - M1978271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:16 AM
Creation date
12/9/2008 9:00:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978271
IBM Index Class Name
REVISION
Doc Date
2/5/2008
Doc Name
FW increase
From
DRMS
To
Asphalt Gravel Products, Inc.
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />.:.. <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Alamosa <br />Transportation Cycle Time : Non- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost $3,155.80 <br />Return time (hours) = 0.38 0.38 two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $23.20 <br />Unloading time (hours) = 1.00 NA •• one round trip, no haul rig <br />Subtotals = 2.75 0.75 <br /> <br />JOB TIME AND COST Total job time : 5.50 hours <br />Total job cost : $3,179
The URL can be used to link to this page
Your browser does not support the video tag.