Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILIZATION <br />. <br />PROJECT IDENTIFICATION <br />Agency or organization name <br />Task #: 007 State <br />Date : 0112212008 <br />User : KAP <br />Permit/job #: M-1978-271 <br />Abbreviation :none <br />Filename : M271-007 <br />Permit or other job action : Bond Recalculation Related To Inpsection <br />Task description : Mobilize/Demobilize <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br />-Cat 623G 40.92 $75.32 $117.55 1 $192.87 $117.55 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 2 $217.34 $177.34 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $598.01 $420.34 $0.00 <br />sheet 1 of 2 <br />Colorado Division Of Reclamation Mining And Safety <br />Colorado <br />County : Conejos <br />Site :Garrett Pit