My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-05_PERMIT FILE - M2008082 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008082
>
2008-12-05_PERMIT FILE - M2008082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:40 PM
Creation date
12/8/2008 10:39:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
PERMIT FILE
Doc Date
12/5/2008
Doc Name
New 112c Appl., w/Exhibits A to H
From
Ready Mixed Concrete Company
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4.0 EXHMIT C - PRE-MINING AND MINING PLAN MAPS OF AFFECTED <br />LANDS <br />4.1 Immediately Adjacent Land Owners of Record <br />Property ownership information of immediately adjacent surface landowners of <br />record is shown on site map Exhibit C-2. <br />4.2 Surface Features <br />The primary surface water features within the proposed mine area is Big Dry Creek <br />and the Lupton Bottom and Lupton Meadows Ditch. Minimum mining setbacks will be <br />50 feet. <br />A portion of the permit area is located within the 100-year floodplain of the South <br />Platte River. <br />• There are a number of structures located within 200 feet of the proposed mining <br />stages including the following: <br />• A house and several out buildings (Stewart Residence) located southwest of <br />mining Stage 3. <br />• A house and several out buildings (Schroeder Residence) located west of mining <br />Stage 4 <br />• Anadarko (Kerr-McGee) gas wells, associated tank batteries and gas lines located <br />west of mining Stage 3. See Map Exhibit C-1. <br />• Anadarko (Kerr-McGee) gas wells, associated tank batteries and gas lines located <br />between mining Stages 4 and 5. See Map Exhibit C-1. <br />• Excel owns a high voltage power line that crosses the property east-west. <br />• United Power owns a three-phase power line that is located along the east <br />property line of Morton Lakes. Presently, it is unclear if there is any future need <br />for this line. If it is determined to be of no further use the line will be removed. If <br />the line is in service during mining, the Applicant will seek authorization from <br />. United Power to relocate the line. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.