My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-24_REVISION - M1985008
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985008
>
2008-11-24_REVISION - M1985008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:26 AM
Creation date
12/1/2008 12:38:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985008
IBM Index Class Name
Revision
Doc Date
11/24/2008
Doc Name
FW Increase
From
DRMS
To
Hard Rock Paving & Redi Mix, Inc.
Type & Sequence
SI3
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth - Dry packed <br />Rated payload : 48,000 pounds <br />Payload capacity :__18.82 LCY <br />Cycle Time : <br />Scraper Bowl (volume) Basis <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 18.35 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Scraper <br />Scraper loading time 0.90 minutes Altitude adj.: 1.000 <br />Maneuver and spread time :____0.60 minutes Job efficiency : 0.830 <br />* load time per scraper pair on push-pull models Net correction : 0.830 <br />Travel time : <br />Road condition description : Rutted dirt little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # <br />1 Haul distance (feet) <br />300 Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br /> 0.00 5.00 5.00 2218 0.32 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />minutes <br />--,,,,......, o,.,,. - - -w mduuwueceierauon. Return time : 0.26 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.08 minutes <br />Unadjusted unit production/hour : 1,058.93 LCY/hour *** Adjusted for job conditions : 878.91 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 <br /> scraper(s) <br />Adjusted single scraper team (unit) hourly production : 878.91 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 878.91 LCY/hour <br /> <br />X X: <br />......::..:. <br />.: <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 46.46 Hours <br />Unit cost : $0.696 /LCY Total job cost : $28,427 <br /> <br />Site altitude (ft.) : 6,980 <br />Push dozer Source <br />NA (Cat HB) <br />NA (Cat HB) <br />NA <br />sheet 2 of 2 <br />Return route Haul time : 0.32
The URL can be used to link to this page
Your browser does not support the video tag.