My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-24_REVISION - M1985008
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985008
>
2008-11-24_REVISION - M1985008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:26 AM
Creation date
12/1/2008 12:38:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985008
IBM Index Class Name
Revision
Doc Date
11/24/2008
Doc Name
FW Increase
From
DRMS
To
Hard Rock Paving & Redi Mix, Inc.
Type & Sequence
SI3
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />:: <br />PROJECT IDENTIFICATION -- <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />004 State :Colorado Permit/job #: M- 1985-008 <br />1111812008 County : Huerfano Abbreviation : none <br />KAE Site: Leone-Gardner Gravel Filename :M008-004 <br />Permit or other job action : Bond Recalculation Relative To Inspection <br />Task description : Spread Topsoil <br />HOURLY EQUIPMENT COST <br />ipment Description <br />Cost Bra <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : Cat D8R Series ll - 8SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />,akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 0 NA NA NA <br />Ownerhip cost/hour : $67.01 NA $50.32 NA NA NA <br />Operating cost/hour : $133.84 NA $77.13 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $225.79 NA $160.22 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $451.58 Support : $160.22 Maintenance : $0.00 <br />Total work team cost/hour : $611.80 <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor : Earth Dry Packed
The URL can be used to link to this page
Your browser does not support the video tag.