My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-26_PERMIT FILE - M2008080 (7)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2008-11-26_PERMIT FILE - M2008080 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:19 PM
Creation date
12/1/2008 10:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
11/26/2008
Doc Name
Slope Stability Report
From
Journey Ventures, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following recommendations for monitoring of slope stability should be followed: <br />1. A visual inspection of the excavated high walls should be done on a weekly basis <br />for the first 6 months of mining. This inspection should consist of walking the <br />existing ground and looking for any signs of stress cracks or other potential signs <br />of slope failure. Some minor sloughing of high walls is expected on any mine site. <br />The intent of this inspection is to locate potential major slope failures that could <br />extend back into a structure. <br />2. A visual inspection should be done after a major precipitation event that has <br />saturated the ground using the same procedures. A major precipitation event <br />would be defined as a storm that produces an intensity level reached once in 50 <br />years on the average. <br />3. If a visual inspection detects signs of a potential slope failure, qualified personnel <br />should be contacted to evaluate and recommend remediation work to stabilize <br />the area. <br />4. If no visible signs of slope failure are detected within the first 6 months, then the <br />inspection period could be reduced to once per month or after every major <br />precipitation event. <br />Journey Ventures, LLC - Kersey Gravel Pit <br />Slope Stability Analysis <br />Page 6
The URL can be used to link to this page
Your browser does not support the video tag.