My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-26_PERMIT FILE - M2008080 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2008-11-26_PERMIT FILE - M2008080 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:19 PM
Creation date
12/1/2008 10:37:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
11/26/2008
Doc Name
Exhibit L- Reclamation Cost
From
Journey Ventures, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Journey Ventures, LLC <br />11/24/2008 <br />FROclasmation Kersey Gravel Pit <br />Bond Quantities and Costs tpygcy <br />Cousdtlm Iftae. 07113 Journey Ventures Pit Rec =ad <br />Phase 7 (6.54 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Minina Area <br />Credit for Slurry Wall Required to Close Phases 3-6 (5,778) If $ 310.00 $ (1,791,127) <br />Slurry Wall Required to Close Phases 3-7 6,376 If $ 310.00 $ 1,976,439 <br />Dewatering Req'd for Phase 7 Area 129.08 Mil. Gal. $ 200.00 $ 25,816 <br /> Total Direct Cost $ 211,128 <br />Overhead and Profit Cost (12.60%) $ 26,602 <br />Contract Cost $ 237,730 <br />Project Management (9.25%) $ 21,990 <br />Additional Financial Warranty Required For Phase 7 $ 259,720 <br />Cummulative Financial Warranty Required For Phases 1-7 $ 2,588,683 <br />Phase 6 (19.07 acres) <br />Reclamation operation Quantity Unit Unit Cost Cost <br />Active Minima Area <br />Credit for Slurry Wall Required to Close Phases 3-7 (6,376) If $ 310.00 $ (1,976,439) <br />Slurry Wall Required to Close Phases 3-8 7,790 if $ 310.00 $ 2,414,900 <br />Dewatering Req'd for Phase 8 Area 233.53 Mil. Gal. $ 200.00 $ 46,706 <br /> Total Direct Cost $ 485,167 <br />Overhead and Profit Cost (12.60%) $ 61,131 <br />Contract Cost $ 546,298 <br />Project Management (9.25%) $ 50,533 <br />Additional Financial Wanan Required For Phase 8 $ 596,830 <br />Cummulative Financial Warranty Required For Phases 1-8 $ 3,185,513 <br />Phase 9 (3.60 acres) <br />[Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 3-8 (7,790) If $ 310.00 $ (2,414,900) <br />Slurry Wall Required to Close Phases 3-9 7,678 If $ 310.00 $ 2,380,180 <br />Scarifying Disturbed Area Phase 9 0.05 ac $ 200 $ 10 <br />Topsoil Placement Disturbed Area Phase 9 0.05 ac $ 1,800 $ 90 <br />Revegetate Disturbed Area Phase 9 0.05 ac $ 1,000 $ 50 <br />Dewatering Req'd for Phase 9 Area 245.72 Mil. Gal. $ 200.00 $ 49,144 <br /> Total Direct Cost $ 14,574 <br />Overhead and Profit Cost (12.60%) $ 1,836 <br />Contract Cost $ 16,410 <br />Project Management (9.25%) $ 1,518 <br />17, <br />I Cummulative Financial Warranty Required For Phases 1-9 $ 3,203,442 1 <br />4of5 <br />142
The URL can be used to link to this page
Your browser does not support the video tag.