Laserfiche WebLink
fill 8 in both the east and west downdrains. Some minor work remains to be completed on <br />the wing terrace ditches at the west downdrain of fill 8. The operator is actively moving <br />larger rocks to the edges of the downdrains to avoid excessive obstacles to flow as it passes <br />down these armored ditches, as shown in the photograph below. <br />•11W L <br />, Arc • . <br />The operator has also changed <br />the flow direction on the west <br />downdrain to fill 7 by <br />straightening the lower section to <br />more closely match the fall line. <br />This should prevent flow from <br />jumping the ditch before it <br />reaches pond 7. Seeding of this <br />small disturbance has also been <br />completed. <br />Overall, the site appeared in <br />good condition for the early <br />winter season.