My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-20_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-08-20_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:38 PM
Creation date
11/26/2008 10:27:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/20/2008
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />04' ~ <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT g~' <br />AIR POLLUTION CONTROL DMSION ~' <br />TELEPHONE: (303) 6923150 ; s <br />• rays <br />CONSTRUCTION PERMIT <br />PERMIT NO: 03DL0099F <br />INITIAL APPROVAL <br />DATE ISSUED: AIIGOST 20, 2004 Modification <br />ISSUED TO: Bowie Resources. LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Bowie number 2 coal mine, 5 miles east of Paonia on highway 133, Bowie, Delta County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />B Seam Portal Development -material extraction, handling, stockpiling, and hauling <br />' THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND <br />CONTROL ACT C.R.S. (25-7-101 et se , TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED <br />IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by Regulation <br />No. 1, Section III.D.1.b. <br />2. Construction of this source must commence within 18 months of initial approval permit issuance <br />date or within 18 months of date on which such construction or activity was scheduled to <br />commence as stated in the applira&on. If commencement does not occur within the stated time <br />the permit will expire on FSBt3DARY 20, 2006 (See General Condition <br />No. 6., Item 1.) (Reference:Regulation 3, Part B, IV.G.4.) <br />3. The Division's approval of the control plan is based on the submitted production level as listed <br />below. Prior to any increase in daily or annual production rates, the applicant shall submit an Air <br />Pollutant Emission Notice and Control Plan revision which will be subject to Division review and <br />approval to ensure compliance with the National Ambient Air Quality Standards for particulate <br />matter. Records of the actual production rate shall be maintained by the applicant and made <br />available to the Division for inspection upon request. (Reference: Regulation 1, III.D.1.b.) <br />Moving of soil materials shall not exceed 24,350 tons per year. <br />Moving of overburden materials shall not exceed 147,160 tons per year. <br />029/0049/014 ver. 2/00 <br />Sc3-2 <br />~JPPl2oVEI~ 4~Z8~ozl <br />
The URL can be used to link to this page
Your browser does not support the video tag.