My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-24_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1997-06-24_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:17 PM
Creation date
11/25/2008 10:37:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
6/24/1997
Doc Name
Amended Notice of Authorization for the Use and Distribution of Biosolids
From
CDPHE
To
Climax Molyb
Type & Sequence
TR9
Email Name
ACS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Breckenridge Sanitation District PART II <br /> Copper Mountain Water and Sanitation District Page 3 of 5 <br /> Frisco Sanitation District CDPH&E BMP#0834 <br /> Dillon/Silverthorne Joint Authority <br /> Summit County Snake River Wastewater Treatment Plant <br /> Climax Molybdenum Company <br /> Robinson Tailing Site <br /> portions of Sections 27, 34 and 35, Township 7 South, Range 79 West and <br /> portions of Sections 2&3, Township 8 South, Range 79 West; Summit County <br /> Summit County <br /> SPECIAL CONDITIONS <br /> II.A Biosolids Application Rates <br /> The initial biosolids application rate for the Robinson Tailing site shall not exceed 30 dry tons per acre. Upon completion <br /> of the initial application phase subsequent biosolids applications shall be calculated based upon updated soil and biosolids <br /> analyses. Additional organic materials and fertilizer may be applied in combination with the biosolids, however, the <br /> concentration of plant available nitrogen for any such mixture shall not exceed 75 pounds per acre of plant available nitrogen. <br /> 11.11 Biosolids Monitoring <br /> Biosolids monitoring requirements are specified in Section 4.9.16.A of the Biosolids Re ilntion(5 CCR 1002-19,4.9.0). <br /> Division records indicate that the permittees' 1993 biosolids production rates are as identified below. Monitoring of biosolids <br /> for parameters identified at section 4.9.16,table 7,and to demonstrate compliance with pathogen destruction criteria identified <br /> at section 4.9.12.B(8)and vector attraction reduction criteria at 4.9.12.0 is required on a once per quarter basis for those <br /> facilities exceeding 319 dry tons of biosolids production annually,and once per year for those facilities which do not <br /> exceed 319 dry toivs per year biosolids production. The frequencies of analysis specified above are subject to change should <br /> the facilities' biosolids production levels change. <br /> Breckenridge Sanitation District 347 dry tons <br /> Copper Mountain Water and Sanitation District 93 dry tons <br /> Frisco Sanitation District 168 dry tons <br /> Dillon/Silverthorne Joint Authority 242 dry tons <br /> Summit County Snake River Wastewater Treatment Plant 104 dry tons <br /> II.0 Soils Monitoring <br /> Pursuant to Sections 4.9.16.B of the Biosolids Regulation, (5 CCR 1002-19,4.9.0), post-application soils monitoring for those <br /> parameters identified in 4.9.16.13,tables 8 and 9 of the Biosolids Regulation shall be required. Monitoring shall be performed <br /> on samples collected in accordance with the provisions of section 4.9.16.B of the Biosolids Regulation.ation. Samples should be <br /> collected so as to be representative of that area to which biosolids are applied within a given calendar year. It is expected <br /> that the amount of acreage to which biosolids are applied will not exceed 320 acres per year. Thus, for purposes of this <br /> section, only a single composite soil sample will be required. Collection of soil samples is not required until seeding is <br /> complete and emergence and establishment of vegetation has occurred, however, in no case should soil sampling occur more <br /> than two years after application has taken place. <br />
The URL can be used to link to this page
Your browser does not support the video tag.