Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado Permitfjob# :M-1990-057 <br />Date : 1111612007 County:Lake Abbreviation :none <br />User : ESC Site :Hopemore Shaft Filename :M057-005 <br />Agency or organization name : DRMS <br />Permit or other job action : Reevaluate Amount of Required Bond <br />Task description :Backtill and Grade at the Mill Site <br />HOl1 RL°_ - *_ENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $1.68 25 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $168.71 Total fleet cost/hour : $168.71 <br /> <br />MATERIAL QUANTITIES <br />Loose <br />Swell <br />Initial <br />2500 BCY factor : <br />1.330 <br />volume:- 3,325 <br />LCY <br />volume : <br />Source of estimated volume: DRMS Estimate <br />Source of estimated swell factor :CAT Handbook <br />Job Condition Correction Factors Source <br />HOURLY PRODUCTION i <br />n <br />for skill • 0 75 ? <br />(avg.) <br />a <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />r`nn.enlidatad StOCkDI/e <br />Average push gradient : 0.00 % (I <br />Average site altitude : 10,000 feet <br />Material weight : 2,900 Ibs/LCY <br />per <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />(1 <br />(Cat HB) <br />(Cat HB) <br />Weight descnphon . <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 250.44 LCY/hr <br />Adjusted fleet production : 250.44 LCY/hr <br />JOB TIME AND COST <br />Fleet size Dozer(s) Total job time : 13.28 Hours <br />Unit cost : $0.674 /LCY Total job cost : $2.240