My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-10_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2008-01-10_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:26 AM
Creation date
11/20/2008 2:05:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
Revision
Doc Date
1/10/2008
Doc Name
Re-sent FW increase
From
DRMS
To
Capital Gold Corporation
Type & Sequence
SI3
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 004 State : Colorado Permit/job# :M-1990-057 <br />Date <br />User <br />1111612007 <br />ESC <br />County : Lake <br />Site : Hopemore Shaft <br />Agency or organization name : DRMS <br />Permit or other job action : Reevaluate Amount of Required Bond <br />Task description : Backflll and Grade at the Hopemore Shaft Area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series Il - 8SU (200; Horsepower : 310 <br />Blade type :"Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 1,000 BCY <br />Utilization % <br />$57.13 NA <br />$77.13 100 <br />$1.68 25 <br />$32.78 NA <br />$168.71 Total fleet cost/hour : $168.71 <br />Loose <br />factor : 1.430 volume : 1,430 LCY <br />Source of estimated volume: DRMS Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted till or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 0.94 (Cat HB) <br />Average site altitude : 11,500 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.29 <br />Weight description : <br />Decomposed rack - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 186.19 LCY/hr <br />Adjusted fleet production : 186.19 LCY/hr <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.906 /LCY <br />Abbreviation :none <br />Filename : M057-004 <br />Total job time : 7.68 Hours <br />Total job cost : $1,296
The URL can be used to link to this page
Your browser does not support the video tag.