My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_REVISION - C1980007 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-09_REVISION - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:40 PM
Creation date
11/20/2008 11:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/9/2008
Doc Name
GMUGs conveying post-mining land use direction & Protections & formal consent/concurrence to OSM
From
USFS
To
OSM & DRMS
Type & Sequence
TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Criteria <br /> <br />Topic Design Criteria for the Proposed Action <br /> amendments shall be added, if required in the <br /> Reclamation Plan. <br />Subsoil 109. Minimize footprint of stockpile to limit disturbance. Use FS <br /> for regrading and contouring. <br />Erosion & 110. Erosion will be minimized through interim reclamation BMP <br />Sediment Control including, but not limited to, contouring, seeding and <br /> mulching. <br /> 111. Sediment control measures such as, but not limited to, silt BMP <br /> fence, straw mulch, site containment and sediment control <br /> ponds will be utilized as needed. <br /> 112. Construction on steep slopes (>60%) would be fully Forest Plan <br /> designed and engineered according to Forest Service <br /> standards and design criteria and should include an <br /> erosion control and maintenance plan. <br />Geologic Hazard 113. Leases contain stipulations restricting surface occupancy Federal Coal <br /> in areas of geologic hazards: Avoid areas with high Lease <br /> geologic hazards to prevent mass slope failure in Section Stipulation <br /> 32, T13S, R90W, 6th P.M. unless specifically approved <br /> by authorized officer. <br /> 114. Controlled Surface Occupancy Stipulation. Areas with Federal Coal <br /> moderate geological hazards will require analysis and Lease <br /> mitigation plans detailing construction and mitigation Stipulation <br /> techniques to ensure stability of facilities in portions of <br /> Sections 27-29 and 32-34, T13S, R90W, 6th P.M. and <br /> Sections 3-4,9-10, T14S, R90W, 6th P.M. unless <br /> specifically approved by authorized officer. <br /> 115. No Surface Occupancy Stipulation- No operating on Federal Coal <br /> slopes greater than or equal to 60% or areas surrounded Lease <br /> by slopes greater than or equal to 60% to prevent erosion, Stipulation <br /> mass failure and loss of productivity in portions of <br /> Sections 27-29 and 32-34, T13S, R90W, 6th P.M. and <br /> Sections 3-4, 9-10 TI 4S, R90W, 6th P.M. unless <br /> specifically approved by authorized officer. <br /> 116. Controlled Surface Use Stipulation Surface use on slopes Federal Coal <br /> 40-60% will be subject to analysis and mitigation plans Lease <br /> detailing construction and mitigation techniques to Stipulation <br /> minimize potential for soil loss, mass land movement, <br /> revegetation failure and unacceptable visual impairment <br />• except as otherwise approved by authorized officer. This <br /> may apply to lands in portions of Sections 27-29, 32-34 <br /> T13S, R90W, 6th P.M. and Sections 3-4,9-10, T14S, <br /> R90W, 6th P.M. <br />Incidental Coal 117. An coal recovered incidental to project will be taken MCC Project
The URL can be used to link to this page
Your browser does not support the video tag.