My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_REVISION - C1980007 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-09_REVISION - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:40 PM
Creation date
11/20/2008 11:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/9/2008
Doc Name
GMUGs conveying post-mining land use direction & Protections & formal consent/concurrence to OSM
From
USFS
To
OSM & DRMS
Type & Sequence
TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Criteria <br />Topic Design Criteria for the Proposed Action <br /> 46. Livestock access will be maintained during active BMP <br /> operations. Cattleguards and access gates to the side of <br /> each cattleguard will be installed in a timely fashion at <br /> any place where MCC uses or builds roads as directed by <br /> the District Range Management Specialist. Project <br /> personnel will cooperate with the grazing permit holders <br /> to avoid or minimize conflicts with grazing operations. <br /> 47. MCC would be required to maintain stock ponds adjacent BMP <br /> to project roads to assure their continued effective use. <br /> This would involve pond clean out on an as-needed basis <br />Roads in 48. Any approved road construction or reconstruction in BMP, <br />Inventoried Roadless that are excepted by RACR must be conducted RACR <br />Roadless in a manner that minimizes effects on surface resources, <br /> prevents unnecessary or unreasonable surface <br /> disturbance, and complies with all applicable lease <br /> requirements, land and resource management plan <br /> direction, regulation, and laws. Road Use <br /> Permit (FSM <br /> 49. Roads constructed or reconstructed must be obliterated 2733.04b <br /> when no longer needed for the purposes of the lease or and FSM <br /> upon termination of expiration of the lease, whichever is 7730), <br /> sooner. RACR <br />Staging Areas 50. Staging areas will be used in a manner to minimize BMP <br /> damage to vegetation. Any surface disturbances to these <br /> sites would be re-graded and seeded. <br />Maintenance 51. Roads will be maintained with water bars and appropriate Road Use <br /> sedimentation controls. Water bar placement and design Permit(FSM <br /> will be approved by the authorized FS Officer. 2733.04b <br /> and FSM <br /> 7730), BMP <br /> 52. All use and maintenance of existing NFSRs will be FSM <br /> authorized by and be consistent with a FS Road Use 2733.04b <br /> Permit. A performance bond will be required per the and FSM <br /> terms of the road use permit. 7730 <br />WATER RESOURCES <br />Ground Water 53. Each drill or borehole, well, or other exposed BMP <br /> underground opening sealed, or otherwise managed to <br /> . prevent acid or other toxic drainage from entering ground <br /> or surface waters and minimize disturbance to the <br /> prevailing hydrologic balance.
The URL can be used to link to this page
Your browser does not support the video tag.