Cwt of bulk cement
<br />2,600 gal Water
<br />Octoplug Cut surface
<br />
<br />Hole
<br />
<br />T
<br />Hole (assuming 94 Ibs of
<br />Cement cost
<br />
<br />C
<br />
<br />Ri
<br />i
<br />Ri
<br />i Total rig
<br />
<br />i Rig w/ crew
<br />
<br />h
<br />l
<br />t
<br />
<br />T
<br />t
<br />l
<br />i
<br />water truck truck w/
<br />
<br />d
<br />c
<br />st
<br />i
<br />(Circes,
<br />casing 8
<br />Hole diam. otal volume cement per 1.18 of of per cwt ement g setup t
<br />me g t
<br />me to t
<br />me our
<br />y ra
<br />e g
<br />o
<br />a
<br />r w/driver ver
<br />o
<br />r $19.67 mark Total cost
<br /> d
<br />(in) epth (ft)
<br />(of) hole, that is 100 Ibs
<br />(CIRCES) total cost per hole (hr) fill hole (setup + (Circes, Reed
<br />" toss
<br />hourly rate (rig fill
<br />Perin.
<br />(Circes,
<br /> of cement fills 1.26 fill) drill, 9.0
<br />) (Circes) Slme x diam.) $10.9011f)
<br /> of) truck rate)
<br /> BOREHOLE SEALING WORK - continued Page 2
<br /> Cwt of bulk cement
<br />2,600 gal Water
<br />Octoplug
<br />Cut surface
<br />
<br />Hole
<br />Hole (assuming 94 Ibs of
<br />
<br />1
<br />8
<br />f
<br />f
<br />Cement cost
<br />
<br />C
<br />
<br />Ri
<br />i
<br />Ri
<br />i Total rig
<br />
<br />i Rig w/ crew
<br />
<br />h
<br />l
<br />t
<br />
<br />T
<br />t
<br />l
<br />i
<br />water truck truck w/
<br />
<br />d
<br />t
<br />i
<br />(Circes,
<br />casing 8
<br />Hole diam. Total volume cement per
<br />.1
<br />o
<br />o per cwt ement g setup t
<br />me g t
<br />me to me
<br />t our
<br />y ra
<br />e o
<br />a
<br />g
<br />r w/driver ver cos
<br />r $19.67 mark Total cost
<br /> d
<br />(in) epth (ft)
<br />(of) hole, that is 100 Ibs
<br />(CIRCES) total cost per hole (hr) fill hole (setup + (Circes, Reed
<br />" cost
<br />hourly rasa (rig fill
<br />Perin.
<br />(Circes,
<br /> of cement fills 1.26 fill) drill, 9.0
<br />) (Circes) time x diam.) $10.90/If)
<br /> of) truck rate)
<br />1-E3-73 9 1,055 466 372.8 $6.90 $2,572 3.16 4.66 7.82 $198.22 $1,550 $60 $280 $176 $68 $4,647
<br />2-E3-72 9 1,050 464 371.0 $6.90 $2,560 3.16 4.64 7.79 $198.22 $1,545 $60 $278 $176 $68 $4,628
<br />3-E3-71 9 1,045 462 369.3 $6.90 $2,548 3.15 4.62 7.77 $198.22 $1,539 $60 $277 $176 $68 $4,609
<br />4-E3-67.5 9 1,020 451 360.4 $6.90 $2,487 3.12 4.51 7.63 $198.22 $1,512 $60 $270 $176 $68 $4,514
<br />5-E3-64 9 1,000 442 353.4 $6.90 $2,438 3.10 4.42 7.52 $198.22 $1,490 $60 $265 $176 $68 $4,438
<br />6-E3-60 9 980 433 346.3 $6.90 $2,389 3.08 4.33 7.41 $198.22 $1,468 $60 $260 $176 $68 $4,362
<br />7-E3-56 9 1,065 470 376.3 $6.90 $2,597 3.17 4.70 7.88 $198.22 $1,561 $60 $282 $176 $68 $4,685
<br />8-E3-52 9 1,190 526 420.5 $6.90 $2,901 3.31 5.26 8.57 $198.22 $1,698 $60 $315 $176 $68 $5,159
<br />9-E348.5 9 1,080 477 381.6 $6.90 $2,633 3.19 4.77 7.96 $198.22 $1,578 $60 $286 $176 $68 $4,742
<br />10-E345 9 1,045 462 369.3 $6.90 $2,548 3.15 4.62 7.77 $198.22 $1,539 $60 $277 $176 $68 $4,609
<br />11-E3-41 9 835 369 295.1 $6.90 $2,036 2.92 3.69 6.61 $198.22 $1,310 $60 $221 $176 $68 $3,811
<br />12-E3-37.5 9 790 349 279.2 $6.90 $1,926 2.87 3.49 6.36 $198.22 $1,260 $60 $209 $176 $68 $3,641
<br />13-E3-33.5 9 740 327 261.5 $6.90 $1,804 2.81 3.27 6.08 $198.22 $1,206 $60 $196 $176 $68 $3,451
<br />14-E3-30 9 680 300 240.3 $6.90 $1,658 2.75 3.00 5.75 $198.22 $1,140 $60 $180 $176 $68 $3,223
<br />15-E3-26 9 805 356 284.5 $6.90 $1,963 2.89 3.56 6.44 $198.22 $1,277 $60 $213 $176 $68 $3,697
<br />16-E3-22.3 9 720 318 254.4 $6.90 $1,756 2.79 3.18 5.97 $198.22 $1,184 $60 $191 $176 $68 $3,375
<br />17-E3-18.5 9 735 325 259.7 $6.90 $1,792 2.81 3.25 6.06 $198.22 $1,200 $60 $195 $176 $68 $3,432
<br />18-E3-15 9 710 314 250.9 $6.90 $1,731 2.78 3.14 5.92 $198.22 $1,173 $60 $188 $176 $68 $3,337
<br />19-E3-11 9 760 336 268.6 $6.90 $1,853 2.84 3.36 6.19 $198.22 $1,228 $60 $201 $176 $68 $3,527
<br />20-E3-7.5 9 610 269 215.6 $6.90 $1,487 2.67 2.69 5.37 $198.22 $1,064 $60 $162 $176 $68 $2,957
<br /> Total hours 138.84 Total cost (this page) $80,841
<br /> Divided by nu mber of rigs 1
<br /> Net total hours 138.84
|