Laserfiche WebLink
Consolidated Constructors, Inc. <br />Page 2 of 2 <br />Also, in Exhibit R-la, we have designated a proposed phase boundary line move when we proceed <br />to phase 2. This will allow us to bench the highwall in phase 1 along the phase 1 / 2 border to a <br />safe slope. Then mine this area down as we mine out phase 2. This exact location of the common <br />boundary will be determined prior to beginning the actual move into phase 2. <br />Our actual move to Phase 2 will require a move of the crusher, scales, and stockpile locations. <br />These changes will be determined and reported to you after we aze closer to the completion of <br />Phase 1 crushing. <br />We will continue to use berms throughout the mine for safety measures, for water retainage, and <br />for sight/appearance appreciation. The interior berms will change for safety and water control. <br />The exterior berms will mostly be used for cosmetics and appearance as well as storm water <br />containment. <br />We believe this revised process of mining the azea is more efficient, safer, and easier to maintain <br />than the original. <br />We are submitting a La Plata County Landowner Weed Management Plan that was prepared by <br />Mr. Rod Cook, La Plata County Weed Officer. We are asking to have this Weed Control Plan <br />incorporated into our Mine Plan. <br />We aze asking for you to review and adopt these revised mining plan changes for Permit No. M- <br />2003-003. For this technical revision we are enclosing our check for $216.00. <br />If we need to write an additional letter to formally request the technical revision or if we need to <br />submit additional information, please let us know and we will make every effort to submit the <br />materials that you need in a timely manner. <br />Regazds, <br />d <br />~~ ~~~-% <br />"Joe Kozimo <br />