My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-06_REVISION - M2003003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003003
>
2008-11-06_REVISION - M2003003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:20 PM
Creation date
11/11/2008 1:46:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003003
IBM Index Class Name
REVISION
Doc Date
11/6/2008
Doc Name
Change phased mining plan and add weed control
From
Consolidated Constructors, Inc
To
DRMS
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6~ <br />~~- ~ Consolidated <br />Page 1 of 2 <br />Constructors, Inc. <br />P.O. Box 629 <br />1370 Hwy 371 <br />Farmington, New Mexico 87499 <br />DATE: October 20, 2008 <br />TO: Bob Oswald <br />,: Division of Reclamation <br />Mining and Safety <br />691 County Road 233, Suite A-2 <br />Durango, Co. 81301 <br />RE: Consolidated Constructors, Inc. <br />Amzak Pit `-' <br />Permit No. M-2003-003 <br />Revised Mine Plan <br />Bob Oswald, <br />t` ~ <br />Phone: 505 326-7771 <br />FAX: 505 326-7774 <br />~~~' <br />~'~ 0 <br />` ~ 6 <br />. i~ ~ ~ ~~~'~ (7~,~ <br />Please find our request for Mine Plan Modification herein. <br />..~~ <br />~~ <br />l v ~~ v-i ~ Off/ <br />~ ~ ~ ~~ <br />t <br />We are submitting a new Exhibit R-1 to replace the existing Exhibit C-D. We aze also submitting <br />our Exhibit R-1 a. <br />Exhibit R-1 shows a location revision to phases 1, 2,, 3, 4, & 5 to new boundary lines for Phases 1, <br />2, 3, 4, and 5. <br />From the original Exhibit C-D, we aze making the following changes; <br />Phase 1-enlarged north and west to make a more uniform mine. <br />Phase 2 -change the designation to Phase 3 otherwise remaining unchanged. <br />Phase 3 -Change the nomenclature to designate this area as Phase 4, otherwise unchanged. <br />Phase 4 -Change the nomenclature to designate this azea as Phase 5, otherwise unchanged. <br />Phase 5 - Change the nomenclature to Phase 2. Decrease the size of this phase and move <br />the East boundary - North/South line approximately 100 feet to the West. After completing our <br />Phase 1 mining, we plan to move this line back to the East when we make the move to Phase 2. <br />This will enable us to mine the entire seam and not leave an unmined portion of rocks along the <br />north/south phase line. <br />In Exhibit R-1 a, we aze also showing approximate locations of the mine entrance road, the scales, <br />the stock pile areas, the crusher site, the asphalt/concrete recycle stockpile location, the berm <br />locations, the pit entrance road, and an access road through the mine to access a processing site that <br />is not a portion or our mine or mining plan. This will allow them access without interfering with <br />our mining operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.