Laserfiche WebLink
(Page 3) <br /> MINE ID # OR PROSPECTING ID # M-77-493 <br /> INSPECTION DATE 4/29/97 INSPECTOR'S INITIALS ACS <br /> stored. As a result, estimation of debris volume by multiplying the yard area by an assumed <br /> depth of 5 feet would likely result in an overestimation of the volume of material that <br /> exists. However, without additional information, this type of volume estimation will suffice <br /> for the purposes of a preliminary cost estimate. The bone yard debris and materials volume <br /> can be refined through the provision of additional information from Climax after the snow <br /> melts and after Climax reviews the Division's preliminary estimate. <br /> 5. Several concrete retaining walls were observed at the low end of 6 crusher. <br /> No information on concrete retaining walls was provided in the 4/1/94 submittal. Data on the <br /> square footage, thickness, and degree of reinforcing of the retaining walls must be provided <br /> to the Division to allow estimation of retaining wall demolition costs. <br /> Once Climax provides information on conveyor foundations, the preliminary cost estimate for <br /> structural demolition can be circulated for review. <br /> I & E Contact Address cc: Carl Mount, DMG <br /> ❑ CE <br /> NAME Bryce Romig ❑ BL <br /> OPERATOR Climax Molybdenum Company ❑ FS <br /> STREET Climax Mine ❑ HW <br /> CITY/STATE/ZIP Climax, CO 80429 ❑ HMWMD (CH) <br /> ❑ SE <br /> ❑ WQCD (CH) <br /> ❑ OTHER <br />