III 'll'IIIIII'll'11 <br /> 999 <br /> 3-Dam Borrow Area Reclamation Plan <br /> The attached figure outlines the proposed areas for borrow area development in the 3- <br /> Dam cap project. There are three borrow areas and two riprap areas designated for the <br /> project. Each is located in close proximity to 3-Dam in an attempt to minimize haul <br /> distance. In addition, Area C19 (from 1989 Amendment Am-002, not shown) may be <br /> used for capping material. <br /> The contractor has been given the option of using any area within the outlined 33 acres <br /> for materials needed in the project. Evaluation of the borrow areas in the fall of 1996 <br /> showed that approximately 1.1 MM cubic yards was available for use. About 300,000 <br /> cubic yards of material will be required to cap 3-Dam. Area C19 will provide <br /> approximately 100,000 cubic yards assuming that it meets needed cap material <br /> specifications. Consequently, Climax expects that no more than 20 of the total 33 acres <br /> will be disturbed by the project. <br /> Reclamation of the borrow areas includes the following considerations: <br /> • Topsoil will be removed from all disturbed' areas and will be stockpiled for <br /> replacement at the end of the project. Topsoil recovery will attempt to match <br /> preexisting depths up to 6 inches. Any remaining topsoil will be stockpiled, <br /> stabilized, and used in future reclamation activities. The contractor will attempt to <br /> minimize the extent of disturbance at the borrow sites. <br /> • Stormwater controls will be utilized in the establishment and management of the <br /> borrow areas. <br /> • Woody vegetation will be managed within the Climax biosolids project. <br /> • Upon completion of the borrow activity, the borrow areas will be regraded to a <br /> configuration that approximates original 'contour. The regrade slopes will vary <br /> between 2H:1V and 41-1:1V below repose angle. <br /> • Revegetation will target post mining land use of Rangeland using the Climax seed <br /> mixture and revegetation methods outlined;in the 1989 amendment. Seeding and <br /> mulching will be occur in the fall of 1997'provided site preparation and topsoiling are <br /> completed by October 15. Climax may opt to stabilize the borrow areas in 1997 for <br /> topsoiling and seeding in 1998. The decision will rely on project progress and the <br /> onset of inclement fall weather. <br />