Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial bond release inspection of exploration drill sites for the Grand Valley Book Cliffs <br /> Drilling Program conducted by Jason Musick of the Colorado Division of, Reclamation, Mining, and <br /> Safety (Division) on 07 October 2008. Wendell Koontz of Ark Land Company accompanied the <br /> inspection. The weather was clear and the ground was dry during the inspection. <br /> This inspection was conducted to determine partial bond release on 15 sites drilled and reclaimed in <br /> 2007 and 2008 of NOI X-2007-228-00. Boulders to protect reclamation in place and to remain per <br /> landowner request. <br /> Each abandoned exploration drill site was located using the map provided by Ark Land Company in <br /> the final reclamation report. The results of the inspection, including example photographs of a portion <br /> of the 15 holes is provided below. <br /> .y <br /> '6 <br /> BSW0801 Hole abandoned no surface disturbance Hole BSW0707 abandoned with no evidence <br /> noted. Holes BSW0801 and BSW0802 drilled of drilling. Vegetation will require further <br /> by helicopter, no surface disturbance. Casing growing seasons to establish. Casing below <br /> below surface. Surface. <br /> i. <br /> Hole BSW0706 abandoned Casing below Hole BSW0705 abandoned with casing below <br /> surface. No evidence of damage in or around surface. No erosional features or damage <br /> location of hole. Noted. <br />