Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br /> Colowyo C-1981-019 <br /> 22 October 2008 <br /> The following identifies enforcement actions taken during this inspection, the required <br /> abatement and date of abatement for the violation, previous violations still requiring <br /> abatement and the termination of violations cited during previous inspections. <br /> Notice of Violation CV-2008-003 has been terminated. <br /> Notice of Violation CV-2008-004 remains outstanding. A penalty for the violation has <br /> been set and the Division and Colowyo have an assessment conference scheduled <br /> for 7 November 2008. <br /> Colowyo has almost completed the work on the Prospect drainage that was part of <br /> the abatement for CV-2008-004. There was an excavator working on the north gully <br /> at the time of the inspection. The south gully has been filled and several contour <br /> ditches were installed to help control runoff. Colowyo has contracted with Anson <br /> Construction to clean the Prospect Pond. The cleaning will commence as soon as <br /> Anson can get a long-reach excavator mobilized to the site (on or around 17 <br /> November 2008). <br /> NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> Revised 2/97 <br /> m:\coal\share\forms\8101 <br />