My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981010 (45)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
_INSPECTION - C1981010 (45)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 5:14:42 PM
Creation date
11/7/2008 9:15:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
10/13/2008
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SC-F-06— Drainage coming out of the shrub clump and moving north displayed minimal topsoil <br /> and vegetation. Reseeding of this area may be required in order to initiate the same growth as <br /> surrounding areas. <br /> • Parcel A-B-98 (5.5ac) SL-10—The western portion of this partial contains a recently disturbed <br /> power cable corridor. This disturbance is approximately 12' wide and 400' long and is on the <br /> far western edge of the reclamation. This area cannot be included with the SL-10 application <br /> as this is new disturbance. <br /> Reclamation Success <br /> SL-08 and SL-09— In terms of meeting the criteria for Phase I and II bond release, the reclaimed <br /> areas at Trapper Mine were acceptable with the exception of the above mentioned maintenance and <br /> repair issues. Reclamation, in terms of backfilling, grading, and revegetation success, was great at <br /> the time of the inspection. <br /> SL-10—The overall condition of the Phase III bond release reclamation was good. The reclamation <br /> areas showed good vegetation cover with no issues of invasive or noxious vegetation within the <br /> parcels. Other than the noted maintenance and repair issues noted above, the reclamation areas had <br /> no major problems with damage or erosion at the time of the inspection. <br /> Based on the inspection, SL-08, SL-09, and SL-10 will require the above referenced repair and <br /> maintenance issue to be address before a proposed decision can be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.