Laserfiche WebLink
Within the Technical Revision, you must submit a mine plan map that accurately displays where <br />the current topsoil stockpile is located, if any is still stored on site currently. <br />In summary, by December 1St, 2008, you must submit the following in your Technical Revision: <br />1.) The narrative committing to importing topsoil. <br />2.) A mine plan map displaying the current location of the topsoil stockpile. <br />3.) Fee of $216.00. <br />Regards, <br />Jared Ebert, <br />Environmental Protection Specialist, DRMS <br />Cc: Tony Waldron, DRMS