Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.80 <br />0.80 <br />2.00 <br />2.00 <br />5.60 <br />0.80 <br />0.80 <br />NA <br />NA <br />1.60 <br />Total non-roadable mob/demob cost' <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />Total job time <br />Total job cost <br />Fort Morgan <br />miles <br />mph <br />hours <br />EQUIPMENT HAUL DISTANCE and TIME