Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 004 State : Colorado Permit/job #: M-2008-060 <br />Date : 1010912008 County: Washington Abbreviation :none <br />User : MAC Site: Clg Farms, Vc Filename :M060-004 <br />sheet 1 of 2 <br />Permit or other job action : Calculating Reclamation Bond <br />Task description : MobilizationlDemobilization <br /> <br />.::.:::....................................... .......................... <br />...... EQUIPMENT TRANSPORT RIG COST Shift basis : <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADARLF FOUIPMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 631G 51.23 $78.78 $125.45 2 $408.47 $250.90 $0.00 <br />-Cat D9R - 9U (2005) 61.26 $62.73 $125.45 1 $188.18 $125.45 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $596.65 $376.35 $0.00