My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
action has been approved by the MANAGER and CERTIFYING ENGINEER. The specific <br />responsibilities of the CQA Monitor include: <br />? review the design DRAWINGS, project SPECIFICATIONS, and related <br />guidance documents; <br />? review all CONTRACTOR QC submittals and make appropriate <br />recommendations; <br />? observe geosynthetic material delivery, unloading, and storage; <br />? obtain and test geosynthetic conformance samples during geosynthetics <br />manufacture; <br />? observe prepared subgrade prior to geosynthetic deployment; <br />? monitor and document geosynthetic material placement, trial seam testing, <br />non-destructive testing, seaming and repair operations, and destructive <br />testing; <br />? identify seam samples for CQA destructive testing; <br />? assure that testing equipment used, and tests performed are conducted <br />according to project SPECIFICATIONS and industry standards; <br />? perform or observe, document, and report test results to MANAGER as <br />required; <br />? report any deficiencies to MANAGER that are not corrected to the <br />satisfaction of the COA Monitor, including design or project SPECIFICATION <br />changes; and <br />? prepare a Construction Certification Report describing the construction, any <br />deviations from SPECIFICATIONS or, DRAWINGS and details, details of all <br />field and laboratory details, subgrade acceptance forms, test data, tests <br />results (both laboratory and field), QC submittals, geomembrane panel layout <br />as-built prepared by the CQA Monitor, professional certification that <br />construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is <br />responsible for production of the geosynthetic components outlined in this plan. Each <br />MANUFACTURER must verify prior to construction that the MANUFACTURER can <br />produce material that meets the requirements outlined in project SPECIFICATIONS. <br />Section 01400.2 Page 3 of 12 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />IAHN209%final reponNspeca\0140026.doc
The URL can be used to link to this page
Your browser does not support the video tag.