My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? review and approval of design DRAWINGS and project SPECIFICATIONS for <br />all geosynthetic components of the valley leach facility; <br />? preconstruction coordination with the CQA Monitor to ensure that the CQA <br />Monitor has performed similar reviews of the design DRAWINGS and project <br />SPECIFICATIONS to ensure that the CQA Plan can be implemented: <br />? coordination of all construction activities associated with the various <br />CONTRACTOR(S); <br />? scheduling and coordinating construction activities with required CQA <br />testing and activities; <br />? overseeing the construction quality control operations performed by the <br />CONTRACTOR(S); <br />? approve specific corrective measures to be implemented during construction <br />when deviations from the SPECIFICATIONS occur; <br />? ensure that required quality control testing has been performed in <br />accordance with the CQA Plan and to the satisfaction of the CQA Monitor; <br />and <br />? ensure that the CQA personnel are provided with all documentation required <br />in the CQA Plan and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to Golder Associates Inc. <br />The DESIGN ENGINEER is the individual or firm responsible for the design and <br />preparation of the project construction DRAWINGS and project SPECIFICATIONS. The <br />DESIGN ENGINEER is responsible for approving all design and project SPECIFICATION <br />changes, modifications, or clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). <br />CERTIFYING ENGINEER is the individual or firm responsible for certifying the <br />construction was performed in compliance with the DRAWINGS and SPECIFICATIONS. <br />MANAGER and CERTIFYING ENGINEER will be responsible for the resolution of ail <br />quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is <br />the firm or individual responsible for performing the CQA tasks outlined in this plan. <br />The CQA Monitor is the official CQA representative of CC&V and has the responsibility <br />of overseeing the CQA aspects of the project. In this CQA Plan the CQA Monitor is <br />associated with the CERTIFYING ENGINEER and refers specifically to (To Be <br />Determined). The CQA Monitor has the authority to stop any aspect of the work that is <br />not in compliance with the CQA Plan. Work would then be resumed once corrective <br />Section 01400.2 Page 2 of 12 March 22, 2000 <br />Geosynthetic COA Plan Golder Associates Revision 5 <br />1A99\2099\final report\3peca\014002r5.doc
The URL can be used to link to this page
Your browser does not support the video tag.