My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for geomembrane installation as discussed in Section 02200 of the <br />SPECIFICATIONS; <br />? monitor Bedding Fill placement and surface preparation to verify that the <br />surface is suitable for oeomembrane installation as discussed in Section <br />02200 of the SPECIFICATIONS: <br />? monitor the placement of fill to ensure that CONTRACTOR exercises care in <br />the vicinity of pipes and that the underlying geosynthetics are not damaged; <br />? monitor and document CONTRACTOR verification of in-place Soil Liner Fill, <br />Bedding Fill. Low Volume Solution Collection Fill and Drain Cover Fill <br />thickness; <br />? monitor equipment being used to place Low Volume Solution Collection Fill <br />and Drain Cover Fill to verify that the CONTRACTOR places the material in <br />accordance with the SPECIFICATIONS; <br />? monitor that Low Volume Solution Collection Fill and Drain Cover Fill is <br />pushed uphill for areas in which the slope exceeds 4H:1 V and that the dozer <br />does not perform unacceptable pivot turns; and <br />? monitor the fill temperature as identified in Section 02200 of the <br />SPECIFICATIONS. <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, <br />construction problem resolutions, design and SPECIFICATION changes, photographic <br />records of construction, weekly progress reports, chain of custody forms for test sample <br />tracking, and a Construction Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />Daily records kept by the COA Monitor shall consist of field notes, observation and testing <br />data sheets, summary of the daily meeting with CONTRACTOR, and reporting of <br />construction problems and resolutions. The CQA Monitor shall submit this information on <br />a regular basis to MANAGER for review. <br />7.02 SOILS OBSERVATION AND TESTING FORMS: <br />The CQA Monitor will document soils observations on forms that generally include the <br />following information: <br />? date, project name, location, and weather data, including high and low daily <br />temperatures; <br />? a site plan showing work areas and test locations; <br />? descriptions of ongoing construction detailing work areas and equipment <br />utilized by CONTRACTOR; <br />Section 01400.1 Page 7 of 11 March 22, 2000 <br />Earthworks COA Plan Golder Associates Revision 5 <br />t:\99\2099UIna1 report\speu\014001 r5.Coc
The URL can be used to link to this page
Your browser does not support the video tag.