Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Flatbed Truck, 4x2, 30K GVW $47.52 1 $47.52 $47.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.52 $47.52 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.10 0.10 Total non-roadable mob/demob cost <br />Return time (hours) = 0.10 0.10 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = 0.50 NA •? one round trip, no haul rig <br />Subtotals = 1.20 0.20 <br /> <br />JOB TIME AND COST Total job time <br />Total job cost : <br />Cortez <br />2.5 miles <br />25.0 mph <br />$646.58 <br />$9.50 <br />2.40 hours <br />$656