My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-24_INSPECTION - M1976059
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1976059
>
2008-10-24_INSPECTION - M1976059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:25 PM
Creation date
10/28/2008 12:07:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976059
IBM Index Class Name
INSPECTION
Doc Date
10/24/2008
Doc Name
Inspection report
From
DRMS
To
Skanska USA Civil West Rocky Mtn District
Inspection Date
8/28/2008
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 005 State : Colorado Permit/job #:M-1976-059 <br />Date : 1012412008 County :Montezuma Abbreviation :none <br />User : WHE Site : Cortez Sandstone Pit Filename : M059-005 <br />Permit or other job action : Routine Bond Update <br />Task description :Haul reclamation equipment to and from job site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADARLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br /> <br />-Cat D8R Series /I - 8SU (2 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br /> <br />-Revegetation equipment 10.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.44 $214.12 $0.00 <br />sheet 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.