My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-23_PERMIT FILE - C1983059A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059A
>
2008-05-23_PERMIT FILE - C1983059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:56 PM
Creation date
10/27/2008 11:26:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
5/23/2008
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User: JRS <br />Site :Terror Creek Loadout <br />Agency or organization name :Colorado Division Of Reclamation, Mining And <br />Permit or other job action :Permit Renewal 05 <br />Task description :Compact Coal Material in On-Site Dispo <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 815E <br />Area <br />Horsepower: 240 <br />Compactor type :Soil -tamping foot <br />volume : 9,559 LCY factor : 0.870 <br />Shift basis : 1 per day <br />volume : 8,316 CCY <br />Source of estimated volume :Map 5 -Assume 1' Over 5 Acres <br />Source of estimated shrinkage factor :CAT Handbook <br />;; <br />;: <br />HOURLY PRODUCTION <br />Unadjusted hourly production = lW x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 5,800 feet <br />Filename : C059-005 <br />6.42 feet <br />5.00 mph <br />12.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />5 passes <br />1, 255.75 CCY/hr <br /> Source <br />Altitude adjustment factor : 1.00 _ (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.