Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado Permitlob# : C-1983-059 <br />Date <br />User <br />04/09/7008 <br />JRS <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Pemtit Renewal 05 <br />Task description :Move Sediment Storage Pile for On-Site Disposal <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 1,500 CCY volume <br />1, 688 LCY <br />Source of estimated volume :Map 5 and Page 2.05-3 <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION ,:. <br />Job Condition Correction Factors ; <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 °~ (pos) Altitude : 1.00 (Cat H8) <br />Average site altitude : 5,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Earth -Dry packed <br />1.125 <br />Adjusted unit production : 353.60 LCY/hr <br />Adjusted fleet production : 353.60 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Totat job time : 4.77 Hours <br />Unit cost : $0.587 /LCY Total job cost : $990 <br />County :Delta <br />Site :Terror Creek Loadout <br />factor <br />Abbreviation :none <br />Filename : C059-003 <br />