CIRCES Cost EsGmatlno3ottware
<br />DEMOLITION WORK
<br />.,.::..
<br />PROJECT IDENTIFICATION
<br />Agency or organization name Cobrado Division O/Redamatbn, Mining And Sa/ety
<br />Task # : 15b State :Colorado Pennitfpb# : C-83-059
<br />Date : 09-Apr-2008
<br />User : JRS
<br />Permitting action : Permd Renewal 05
<br />County :Delta
<br />Site :Terror Creek Loadout
<br />Abbreviation :none
<br />Filename : C059-15b
<br />Task description :Demolish and Remove All Structures
<br />.:::...
<br />NIT COSTS .;....: ;. ;::.::
<br />~ Last unit cost u
<br />plate : January, 2003 Location adjustment . 100.20%
<br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST
<br />Conveyors
<br />-Truck Dump ro Pnmary 180 LF Conveyor, overand - 5' W x 6' H 180.00 LF $12.7500 $2, 295.00
<br />-Primary ro Secondary 80 LF Conveyor, overland - 5' W x 6' H 80.00 LF $12.7500 $1, 020.00
<br />-Pnmary ro Transfer 100 LF Conveyoi overand - 5' W x 6' H 100.00 LF $12.7500 $1,275.00
<br />-Crusher ro Secondary 80 LF Conveyor, overland - 5' W x 6' H 80.00 LF $12.7500 $1, 020.00
<br />-Secondary to Transfer 46 LF Conveyor, overand - 5' W x 6' H 46.00 LF $12.7500 $586.50
<br />-Recaim 60 LF Conveyor, overland - 5' W x 6' H 60.00 LF $12.7500 $765.00
<br />-Reclaim ro Transfer 100 LF Conveyor, overand - 5' Wx 6' H 100.00 LF $12.7500 $1,275.00
<br />-Transfer to Loadout 100 LF Conveyor, ovedand - 5' W x 6' H 100.00 LF $12.7500 $1, 275.00
<br />- Conveyor Footings 2x 1 k 14 LF Demo./lisp. exc. prt, 1 k2' - 200 R. 14.00 LF $4.9924 $69.89
<br />
<br />-Railroad Tracks 1,650 LF Railroad track -Tres and track 1,650.00 LF $6.5200 $10,758.00
<br />- Ballast 1,100 CY Railroad track -Ballast 1,100.00 CY $2.9400 $3,234.00
<br />
<br />
<br />
<br />-Remove Fencing Around Substations 164 LF Fencing, chain link - 8-10 ft. H 164.00 LF $1.9400 $318.16
<br />
<br />-Remove Retaining Wall 272x7.5x12" Demo./lisp.exc. pd, 12"th.-200 R. 2,040.00 SF $3.4374 $7,012.29
<br />- Foofing 1 k2x 128 LF Demo./lisp. exc. prt, 1x2' - 200 R. 128.00 LF $4.9924 $639.03
<br />
<br />-Concrete Sump 36.Sx36.5x6° Demo./lisp. exc. pit, 6"th.-200 R. 1,332.00 SF $1.2481 $1,662.47
<br />
<br />-Powerlines and Poles 1 f 15 LF Power/phone line -single pole 1,115.00 LF $2.1400 $2, 386.10
<br />
<br />-Coal Loadout Bin 10x6kf2' Demo./lisp./excav. prt - 200' push 720.00 CF $0.1588 $114.37
<br />
<br />-Road Pavement 300x24 x6" Pavement, bitum. - 4-6" th. 800.00 SY $4.7500 $3,800.00
<br />-Guard Rails 1140 LF Roadside quiderail and posts 1,140.00 LF $7.7200 $8, 800.80
<br />
<br />-Stoker Oil Building Expansion Superstrodure 10'x10x 10' Demo./lisp./excav. pit - 200' push 1,000.00 CF $0.1345 $134.53
<br />- Floor fOx10x4" Demo./lisp. exc. prt, 4" th.- 200 R. 100.00 SF $0.8321 $83.21
<br />- Walls fOx12'x4" Demo./lisp.exc. prt, 4"th.-200 R. 120.00 SF $1.1458 $137.50
<br />
<br />-Reclaim Tunnel Superstructure 60x8'x8' Demo./lisp./appr, dump - fo 5 mi. 3,840.00 CF $0.6936 $2,663.29
<br />- Floor 60x5x6' Demo./lisp. exc. prt, 6" th.- 200 R. 300.00 SF $1.2481 $374.43
<br />- Escapeway 36'x180LF Pipe,CMP-36 in.diam. 180.00 LF $26.2046 $4,716.83
<br />
<br />-Remove Five Barrels of Haz Waste 5(0355 Gallons Haz. waste -Drum mat., 1-6 dr. 5.00 DRUM $381.5459 $1,907.73
<br />
<br />Tank Removal
<br />-6,000 Gallon Fuel Tank 6,000 Gallons Exc.AOad, non-leaking-6K- BKga/. 1.00 EA $593.0000 $593.00
<br />-4,000 Gallon Water Tank 4,000 G8d0r1S Exc./10ed, non-leaking-3K- 5Kgel. 1.00 EA $369.5000 $369.50
<br />-1,500 Gallon Antifreeze Tank 1,500 Gallons Exc./load, noMeaking-3K- SKgal. >.~ EA $369.5000 $369.50
<br />-6,000 Gal/on Antifreeze Tank 6,000 Gallons Exc.Aoad, non-leaking-6K- BKgal. 1.00 EA $593.00 $593.00
<br />-350 Galon Diesel and Unleaded Fuet 2350 Gallons Exc.AOad, noMeaking-3K- 5Kgel. 2.00 EA $369.5000 8739.00
<br />-7,000 Gallon Tank by Crusher 7, 000 Gallons FxcAoad, non-leaking-6K- BKgal. f 00 EA $593.0000 $593.00
<br />- Remove Sludge from A8 Tenks 5 Tanks Remove contents - 3K- 5K gal. 5.00 EA $148.0000 $740.00
<br />- Dispose of Sludge Off-Site Assume 1,000 Gallons OA-sde sludge disposal -Avg. 1,000.00 GAL $3.8~ g3, 800.00
<br />- Add C02 ror Tank Cleaning 25,000 Gallons Total Insert dry ice - i.5 lbs./100 gal. 375.00 LB $1.7900 $871.25
<br />- Haul Tanks ro Certified Dump 6 Tanks Haul to cert. dump - 3K- 5K gal. 6.00 EA $550.0000 $3, 300.00
<br />
<br />-Petroleum Contaminated Soil Clean-Up Assume 200 CY Contain. sod lisp., landfill -Avg. 200.00 CY $189.9600 $37,996.00
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />dvn ws I subtotu Iunadlustsd-: $1tM,0a8 Total Coat (adjusted for IOCationJ: 5108,305
<br />
|