Laserfiche WebLink
CIRCES Cost EsUmatlnaSoRware <br />DEMOLITION WORK <br />x-: A e;. <br />PROJECT IDENTIFICATION g ncy or organization name :Colorado Orvisron Ol Reclamatron, Mining And Safety <br />Task # : 15a State : Coorado Pennitlpb# : C-83Q$9 <br />Date : 09-Apr-2008 County :Dena Abbreviation :none <br />User : JRS Site :Terror Creek Loadout Filename : C059-15a <br />Permitting action : Rarmrt Renewa105 <br />Task description :Demolish and Remove All Structures <br />;,, ; <br />>;:. >: <br />- ;; ;, ;; <br />UNIT COSTS Last unit cost update : January, 2003 Location adjustment . 100.20% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Control Tower Superstructure 16k14k26' Demo,/disp./excav. pit - 200' push 5, 824.00 CF $0.1588 $925.12 <br />- Floor f6k14k6" Demo./disp. exc. pit, 6"th.-200 R. 288.00 SF $1.2481 $359,45 <br /> <br />-Substation Superstructure 16k24k20' Demo./disp./excav. pit-200'push 7,680.00 CF .80.1588 $1,219.93 <br />- FMor 12k10x8" Demo./disp. exc.pR, 8'fh.-200 R. 120.00 SF $1.6641 $199.70 <br />- Footing 1k2k44LF Demo./disp. exc. prt 1k2'-200 R. 44.00 LF $4.9924 $219.67 <br /> <br />-Secondary Substation Superstructure 9k4k6' Demo./disp./excav. pit - 200' push 216.00 CF .80. t 345 $29.06 <br />- Floor 16k6k8` Demo./disp. exc. pit, 8"th.- 200 R. 96.00 SF $1.6641 $159.76 <br /> <br />-Storage Bui/ding Superstructure 52'x12kB' Demo./disp./excav. pit - 200' push 4,992.00 CF $0.1345 $671.56 <br />- Floor 52412k6' Demo./disp. exc. prt, 6" th.- 200 R. 624.00 SF $1.2481 $778.81 <br /> <br />-Scale House Superstructure 9k8X8' Demo./disp./excav. prt - 200' push 576.00 CF $0.1345 $77.49 <br />- Floor 9k8k8" Demo./disp. exc. prt, 8'th.- 200 R. 72.00 SF $1.6641 $119.82 <br /> <br />-Trailer Near Garage 57'x10k 11' Demo./disp./excav. pit - 200' push 6,270.00 CF $0.1345 $843.49 <br /> <br />-Stoker Oil Shed Superstructure 28k10x9' Demo./disp./excav. pit - 200' push 2,460.00 CF $0.1345 $330.94 <br />- Floor 28k10k6" Demo./disp. exc. pit, 6'th.- 200 R. 280.00 SF $1.2481 $349.47 <br />- Footing 3k1.5k76 LF Demo./disp. exc. pit, 1.5x3'-200 R. 76.00 LF $11.2329 $853.70 <br /> <br />-Bath House Superstructure 60k10'x8' Demo./disp./excav. pit-200'push 4,800.00 CF $0.1345 $645.73 <br /> <br />-Over-the-Track Coal Bin Structure 14k12k34' Demo./disp./excav. pit - 200' push 5,712.00 CF $0.1588 $907.32 <br />- Footing 2x2k16LF Demo./disp. exc. pit, 2x3'-200 R. 16.00 LF $14.9772 $239.63 <br /> <br />-Walkway and Stairway Structure 240'x3.3'x3.5' Demo./disp./excav. prt - 200' push 2, 772.00 CF $0.1345 $372.91 <br />- Concrete Pads 5~4k4k6" Demo./disp. exc. pit, 6'th.- 200 R. 80.00 SF $1.2481 $99.84 <br /> <br />-Rail Car Puller Structure 8'x8k4' Demo./disp./excav. prt - 200' push 256.00 CF $0.1345 $34.44 <br />- Slab 10'x10'x12" Demo./disp. exc. pit, 12"th.-200 R. 100.00 SF $2.4962 $249.62 <br /> <br />-PrimaryScreenerSuperstructure 36k14k14' Demo./disp./excav. prt-200'push 7,056.00 CF $0.1588 $1,120.81 <br />- Slab 40ki8k8" Demo./disp. exc. pit, 8"th.-200 R. 720.00 SF $1.6641 $1,198.17 <br /> <br />-Crusher Superstructure Sx8x8' Demo./disp./excav. pit - 200' push 512.00 CF $0.1345 $68.88 <br />- Slab 12k10'x8" Demo./disp. exc. pit, 8"th.-200 R. 120.00 SF $1.6641 $199.70 <br /> <br />-Secondary Screener Superstructure 36k9k14' Demo./disp./excav. pit - 200' push 4,536.00 CF $0.1588 $720.52 <br />- Slab 40k14'x8" Demo./disp. exc. prt, 8'th.-200 R. 560.00 SF $1.6641 $931.91 <br /> <br />Radial Stackers <br />-Secondary to ReGaim 110'x3k30' Demo./disp./excav. prt - 200' push 9,900.00 CF $0.1588 $1,572.57 <br />- Footing 1.5k3k50' Demo./disp. exc. prt, 1.5x3'-200 R. 50.00 LF $11.2329 $561.64 <br />-Secondary to Pile f00'x3k 10' Demo./disp./excav. prt - 200' push 3,000.00 CF .80.1345 $403.58 <br />- Footing 1.5k3'x50' Demo./disp. exc. prt, 1.5'x3'-200 R. 50.00 LF $11.2329 $561.64 <br />-Primary to Lump Pile 1 t70'x3'x 10' Demo./disp./excav prt - 200' push 3,000.00 CF $0.1345 $403.58 <br />- Footing 1.5'x3k50' Demo./disp. exc. prt, 1.5'x3'-200 R. 50.00 LF $11.2329 $56f.64 <br /> <br />-Truck Dump Superstructure 24k18k14' Demo./disp./excav. prt - 200' push 6,048.00 CF $0.1588 $960.70 <br /> <br /> <br /> <br /> <br /> <br /> <br />Culverts <br />-CMP #2 12 x25 LF Pipe, CMP - 12 in. diem. 25.00 LF $2.1737 $54.34 <br />-CMP #3 and CMP #4 18'x95 LF R'pe, CMP - f 8 in. diem. 95.00 LF $2.3533 $223.57 <br />-Prirrap/e Spillway at Sediment Pond 12`x80 LF Pipe, CMP - 12 in. diem. 80.E LF $2.1737 $173.90 <br /> <br />Jyt3 GO57 SubtoW (unadJustedl: E19,406 Total Cost (adjusted for IOCaUon-: E19,4"r3 <br />