My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-15_PERMIT FILE - C1982056A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-08-15_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:32 PM
Creation date
10/27/2008 10:46:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
8/15/2008
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A maximum of approximately 1.0 million cubic yards of un-compacted refuse was 'previously permitted to be <br />temporarily stockpiled in a surge pile at the south end of the refuse area on an area where the topsoil has been <br />~ removed. Actual maximum placement in this area has been approximately 400,000 cubic yards and this volume <br />has been reduced to approximately 80,000 cubic yards by dozing stockpiled material to an adjacent permanent <br />refuse disposal area. Once the remaining stockpiled material is removed and placed in permanent disposal areas, <br />TCC has no future plans to utilize this area for temporary stockpiling (other than the temporary winter stockpiling, <br />as discussed below). Stockpiled materials are transferred, placed, and compacted on active portions of the refuse <br />area. As the stockpiled material is moved and placed, during the summer construction season, any underlying <br />spoil sub-soil material will be recovered and placed on available completed refuse pile bench areas. During the <br />winter, up to 300,000 cubic yards of material may be tail-dumped on active portions of the refuse pile for temporary <br />storage. In the spring, once any frozen materials are thawed so that effective compaction can be achieved, the piles <br />will be spread and compacted as the next lift on the active pile area(s). The pile will be constructed in 50-foot <br />benches, as originally planned, and drainage will be established off of the pile as presented in Exhibit 26A. <br />2) Vertical Construction -This segment has been clarified to remove the requirement to construct "A" and "B" <br />segments as proposed in Exhibit 26A. The recommendation presented in Exhibit 26A-1 to compact the entire lift as <br />one unit without dividing it into segments will be followed. This will increase the stability of the fill by removing <br />the potential for establishing a slip plane between segments A & B. As noted in Exhibit 26A-1, the two-segment <br />construction was for "zoned construction" and this is not required for smaller piles. <br />3) Temporary Road Construction -The temporary road will be filled in with refuse material, as per the <br />recommendation in Exhibit 26A-1, when it is no longer required. The recommendation includes benching and <br />tying in with existing refuse pile to the north and south of this road. <br />4) Subsurface and Surface Draina a -Small drainage ditches will be constructed downslope of the temporary <br />stockpiles to minimize water running over and down finished slopes of the CRDA. Also, it was recommended in <br />Exhibit 26A-1 that temporary drainage ditches be established along the eastern edge of the benches as they are <br />constructed, to prevent excessive surface runoff from flowing over the finished/compacted slope of the CRDA. <br />The specific recommendations for these temporary drainages are presented in Exhibit 26A-1. <br />Coal Refuse Disposal Area Exaansion - Geotechnical Investigations (]VIR07 226) <br />Site geotechnical investigations are required to provide foundation and soils information for design, permitting, and <br />construction of the Coal Refuse Disposal Area Expansion. The area proposed for the Refuse Pile Expansion is an <br />area of reclaimed mine spoils immediately adjacent and to the east of the existing CRDA, as shown on the <br />accompanying figure. Site geotechnical investigations for the CRDA Expansion will involve completion of six to <br />eight, 4-inch hollow-stem auger sample holes to depths of 20-30 feet; excavation of four to six shallow (ten to <br />fifteen feet in depth) backhoe test pits; and collection, examination, and testing of soil samples. There will be a <br />total of no more than twelve auger holes and test pits. <br />MR07-226 2.05-97.1 ~~~~~~1~,~ F~;;~,t ~ ~ ~~=~3 01/30/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.