Laserfiche WebLink
5) The issue will be sited as a possible problem in the inspection report with the <br />resolution date of 90, which can be extended due to construction limitations of both <br />Temperature and moisture. With that in mind, DRMS will allow CC&V to remove the drain <br />cover along the area, in anticipation of the construction of the DAM, prior to the TR <br />submittal. <br />I & E Contact Address <br />NAME: MR. Tim Comer <br />OPERATOR: CC&V <br />ADDRESS P.O.BOX 191 <br />CITY/STATE/ZIP: VICTOR (C) 80860 <br />cc: F CE <br />F BL <br />F FS, <br />F HW <br />F HMWMD (CH) <br />F <br />F SE <br />F WQCD (CH) <br />F OTHER