My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-17_INSPECTION - M1980244
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980244
>
2008-10-17_INSPECTION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:14 PM
Creation date
10/17/2008 11:00:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
INSPECTION
Doc Date
10/17/2008
Doc Name
Insp Rpt
From
DRMS
To
CC&V
Inspection Date
10/7/2008
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL - PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: m-19Rn-944 <br />INSPECTION DATE: IQ/?/_8/10.11'3/1)8 INSPECTORS INITIALS: -@K <br />OBSERVATIONS <br />The Division conducted a monthly monitoring of the site on 10/7/08. The Division had <br />scheduled to conduct the monthly inspection on 10/7/08. On 10/6/08, while conducting <br />inspections in Fremont County, the Division received a phone call from Mr. Mark Vanoni to <br />call him back. At 9:30 a.m, I received a detailed e mail about a spill that occurred <br />outside the lined area along the west side of the Phase IV pad area. In his e mail Mark <br />explained that "at approximately midnight, operations during their routine inspections <br />noticed a small area(6' x33'x6") of dampness on the perimeter road of Phase IVC, (Squaw <br />saddle) at the toe of the severe portion of the perimeter road slope. Flow was immediately <br />shut off (solution application) on the saddle slopes along the North side of the recently <br />placed lifts. No solution was flowing on the surface of the road, it was more a capillary <br />effect. The dampness was confined to the road. All the contaminated area was removed and <br />placed on the VLF. Based on the pore volume of the total material that was saturated, the <br />wad cyanide concentration for the PSSA PHASE IV pond, the volume of solution that was <br />outside the lined area was approximately 180 gallons. The CC&V permit requires the <br />operator to report spills in excess of 10ponds /ton Sodium Cyanide which is approximately <br />1,000 gallons. <br />A trench was immediately dug just inside the perimeter Drain Cove Fill BERM TO CUTOFF <br />SOLUTION WITH IN THE Drain Cover Fill from flowing toward the perimeter of the pad. In the <br />process of excavating the trench( in night time conditions), the liner was torn. The <br />penetration has been isolated from solution flow and will possibly be repaired today, but <br />more likely tomorrow. ERD personnel were on site Saturday morning to verify site <br />conditions and remedial activities. Operations kept a close eye on the area over the <br />weekend. As of 10/6/08, there was no evidence of continued capillary action. Dr. John <br />Luppo P.E, the design engineer, was going to be on site 10/7/08, to recommend long term <br />resolution of the issues". <br />Since I had already planned to be on site,.on 10/7/08 to conduct my monthly inspection and <br />since this area had problems since 2007,and the operator reported the incident even though <br />the amount of spill is below the permit conditions reporting criteria, and all the <br />remedial actions had been taken by the operator, I continued my Fremont County <br />inspections. <br />On 10/7/08 with Dr. John Luppo P.E., Mark Vanoni, Gary Goodrich, Tim Comer & Low Billingly <br />present, met at the area of concern and discussed the permanent SOLUTION for the delivery <br />system. The following was agreed upon by all parties. <br />1) CC&V WILL SUBMIT A Technical Revision to the permit to construct a double lined dam <br />along the inter phase ditch, as part of the extension of the valley leach facility to <br />handle the total anticipated flow plus the maximum precipitation that could contribute <br />flow to the area with in three weeks. <br />2) No solution application will be allowed along the west facing portion of the Phase IV C <br />pad until the TR is approved, and the dam is constructed and certified by the P.E. <br />3) In the interim, CC&V will channel the solution flow from the are into a solid 4 inch <br />pipe so it can be measured weekly, and flow reported to DRMS ON A WEEKLY BASIS. The solid <br />pipe was placed on Thursday 10/9/08.Flow was at 16.4 gpm. Flow on 10/10/08 was at 2.2 GPM <br />as measured by DRMS, FLOW ON 10/13/08 WAS AT 0.75 GPM. Based on the current flow <br />measurement the maximum flow that will be allowed until the dam is constructed will be <br />18.4 gpm as agreed upon by both DRMS and CC&V. <br />4) Production crew will inspect the area every 6 hours until the DAM is constructed and <br />certified, after that the frequency of monitoring will be the revert back to the normal <br />shift frequency.
The URL can be used to link to this page
Your browser does not support the video tag.