Laserfiche WebLink
Customer(s): CLG FARMS LLC <br />LOCATION MAP Date 7/14/2008 <br />w/ acres <br />Wee' I 'Pry'4 T . P(AY\ <br />State and County: CO, WASHINGTON <br />Legend <br />-X0. 3' t <br />Gravel Pit Location <br />cdotstreams I co121 <br />o Gravel Pit Points <br />O plss_a co121 zio 0 2io 60 aao <br />v 1 <br />RoP(& _ VAO Ca "K t6 ? _ Ae7'c'? 06, Ac.rc? <br />RECLAMATION PLAN: <br />A 3:1 slope will be maintained during all the mining process. <br />All of the overburden and topsoil will be replaced when reclaiming the pit. <br />Approximately 1 foot of topsoil and 2 feet of overburden will be replaced. <br />Once replaced the topsoil will be dressed lightly before drilling, after <br />the owner spreads 1 ton of manure. If a weed problem occurs, the owner will <br />mow. <br />The grass mixture will be what the Soil Conservation Service recommendt'd. <br />It consists of Western wheatgrass, blue grama, qreen needle-grass, Bib <br />Small bluestem, buffalo grass and four wind ;.ltbush.