EXI-IIBIT 19 <br />BONDING SCHEDULE for "I'R-55 <br />ACTIVITY QUANTITY UNIT' COST <br />Site Preparation <br />Topsoil Salvage (D-8) <br />Grading Pad & Access (D-8) <br />Safety Panels <br />4' x10' Prefab Panels <br />Placement, Man-Hrs <br />Remove Concrete Cap (10 Ton Crane) <br />Mobilization (Weston) <br />Hourly <br />Shaft Abandonment <br />Rock & Pit Run Material (Initial) <br />Transport & Stockpile <br />Push into Shaft (D-8) <br />Bentonite (Including Placement) <br />MIDCON 2 Standard Cement <br />Super CBL Additive <br />Pit Run Material (Final) <br />Transport & Stockpile <br />Push into Shaft (D-8) <br />Wireline Rig <br />Mobilization (Trinidad) <br />Hourly <br />Cement Plug <br />Site Reclamation <br />Establish Contour (D-8) <br />Spread Topsoil (D-8) <br />Seeding (2 Acres) <br />Seed Mix <br />Mulch <br />Application <br />TOTAL DIRECT COST <br />2 >-lrs <br />4 Hrs <br />l0 Ea <br />2 I-Irs <br />1 Ea <br />4 Hrs <br />220 Yds3 <br />4 Hrs <br />700 Sacks <br />4700 Sacks <br />470 Lbs. <br />400 Yds3 <br />8 Hrs <br />4 Ea <br />8 Hrs. <br />16 yd3 <br />4 I-Irs <br />2 Hrs <br />50 lbs <br />4 ton <br />2 acres <br />$110/hr. <br />$110/hr <br />$ 50/I?a <br />$ 25/Hr <br />$500/Ea <br />$150/IIr <br />$ 10/yd <br />$110/hr. <br />$ 9.60/Sack <br />$ 14.37 <br />$ 4.80 <br />$ 10/yd <br />$110/Hr <br />$125/Ea <br />$ 55/Hr <br />$ 75/yd <br />$1 10/hr <br />$1 10/hr. <br />$12.50/Ib <br />$120/ton <br />$500/ac. <br />'CO"I'AL BOND <br />$ 220 <br />440 <br />500 <br />50 <br />500 <br />600 <br />2,200 <br />440 <br />6,930 <br />67,539 <br />2,256 <br />4,000 <br />880 <br />375 <br />440 <br />1,200 <br />44U <br />220 <br />625 <br />480 <br />1,000 <br />$91,335 <br />~~J~ 1 b <br />~ ~~~ ~ ~ ~ <br />5~ v ~ <br />