Laserfiche WebLink
M. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> the channels but still needs to seed these locations. Post mine drainage control elsewhere at the <br /> site appeared stable and no problems were identified. <br /> Slides &Damage <br /> The slide prone area located above the inlet to Pond 016 continues to be problematic and <br /> unstable. Additional damage has occurred at the slide area. SCC has installed piezometers <br /> located between Pond 016 and 016A to monitor the slide damaged area and determine an <br /> appropriate mitigation plan. <br /> Reve-etg ation <br /> The shrub plot area located above Pond 017 has been constructed (see attached Photo #3). <br /> Aspens have been included at this shrub plot. The large Aspen planting area along the Ridgeline <br /> Access was being planted with aspens. As seen in the attached Photograph#4 a crew was <br /> actively planting aspen at the time of this inspection. <br />