Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />........... <br />PROJECT IDENTIFICATION <br />Task #: 001 State : Colorado Permit/job# : M-1991-081 <br />Date <br />User <br />01/31/2008 <br />KAP <br />County `. Huerfano <br />Site : Keeling Pit <br />Abbreviation :none <br />Filename :M081-001 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : Bond Recalculation related to Inspection <br />Task description :Grade highwalls to 3:1 <br />.................................... . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 15,000 BCY factor : 1.330 volume : 19,950 LCY <br /> <br />Source of estimated volume : Inspection <br />Source of estimated swell factor : decomposed rock <br /> <br />.. ... <br />HOURLY PRODUCTION ....... ... ..... .......... ..............: <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile: 0.80 (fnd-rfJ <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,600 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.57 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 796.61 LCY/hr <br /> Adjusted fleet production : 796.61 LCY/hr <br /> <br />... <br /> <br />JOB TIME AND COST <br />... _, <br />Fleet size : 1 Dozer(s) Total job time : 25.04 Hours <br />Unit cost : $0.210 /LCY Total job cost : $4,183 <br />