Laserfiche WebLink
April 15, 2007 <br />Mr. Steve Fancher <br />LOVELAND READY MIX <br />P.O. Box 299. <br />Loveland, CO 80539-0299 <br />--- -- RE: --- - - ---- --- ---- - -- - - - - <br />Resurvey of Gas Line Monitoring Points Batch Plant Site, Weld County Road 54 CDS Project No. <br />P02-1783 <br />Dear Mr. Fancher. <br />This letter is to state the results of the checking of the gas line monitoring points set in <br />March of 2002. In April 12, 2007, a survey of Points 1 through 10 showed no significant difference <br />or movement from the original survey. Currently, the only extraction areas were adjacent to Points <br />1 through 10. <br />If you have questions regarding this information, please call our office. <br />Sincerely, <br />FOR AND ON BEHALF OF <br />CDS ENGINEERING CORPORATION <br />chael J. I?e?ecker PLS 20676 <br />urvey Supvisor <br />i <br />i <br />ti <br />165 2nd Street S.W. • Loveland, CO 80537 - (970) 667-8010 - Fax: (970) 667-8024